Minimum order quantities: why we quote every project instead
Paradox Manufacturing 18 November 2026 4 min read
Minimum order quantities, or MOQs, are one of the first hurdles new brands meet when approaching a contract manufacturer. Here is why they exist, what really drives your cost per unit, and how we approach quantities at Paradox Manufacturing.
Why manufacturers set minimums
Every production run has fixed work attached to it, such as preparing equipment, batching, setting up the filling line and cleaning down afterwards. Spreading that work over more units lowers the cost of each one, which is why many manufacturers set a minimum. Packaging and raw material suppliers may also set minimums of their own.
What affects your cost per unit
- Quantity: fixed costs are spread over more units in larger runs.
- Formula: ingredients and processing make up a large share of the cost.
- Packaging: the container, closure and decoration.
- Labels and coding: whether you supply labels or we arrange them.
- Testing: stability, micro and preservative testing where needed.
Our approach: no minimum run
There is no minimum run at Paradox Manufacturing. Every project is quoted on the quantities you need. Our batching equipment runs from 50 L pilot batches up to full-scale vessels of 10 t, so you can start with a smaller run and scale up as your brand grows.
How to get an accurate quote
- The product type and format
- Whether you have an existing formula, or need one developed or matched
- Your packaging, or whether you need us to source it
- Approximate quantities for your first run and expected reorders
- Your target cost per unit
Common questions
Is there a minimum order at Paradox?
No. There is no minimum run, and every project is quoted on the quantities you need.
Why can a small run cost more per unit?
The fixed work involved in each production run is spread over fewer units, so the cost per unit is usually higher for smaller runs.